CAMP UPDATE #12
September 10, 2009

When we left today the construction crew were finishing off the insulation and vapour barrier in preparation for the gyprocking which is scheduled to start this coming Monday. The rough in plumbing for the vents and drains is done. We have an enclosed bathtub and were not able to find a proper drain pipe in the Digby area. Bob will have a look in Dartmouth tomorrow.

Most of the deck skirting has been finished and we will need to have the front step modified to accommodate a landing half way down as it is both too long and steep. The concrete support footings have been poured and the crew will finish the stairway sometime in the near future.

Double click to enlarge pictures.


Jonathan took these pictues with his fisheye lense on September 8.
















The following two pictures were taken on September 10 and show the progress that was made skirting the deck.