September 24, 2009

CAMP UPDATE #13

September 23, 2009

The gyprocking and crack filling was completed yesterday and the subcontractor is back today to finish the final sanding. We have been cutover from the temporary power service and have power to the shed. It is a real luxury not to lay out extension cords each time we go to camp. We can now have the fridge on when we leave and take advantage of the electric heat as the weather turns colder.

The plumbing in the shed is finished and the lines pressured tested. Our plan is to temporarily hook up the pump in the camp next week so that we can have running hot water and a functioning toilet in the shed. I installed a pump up toilet in the shed without any rough in plumbing and it has been a project from hell. As you can see from the photo, the walls needed to be opened up to hide the plumping and I wanted the pipes to be installed in a manner that would allow for easy removal of the pump unit for winterization and repairs. The wall is now back together and ready for painting.


Double click to enlarge pictures.




0 Comments:

Post a Comment

<< Home

Genevieve - All Blog No Bull!

Powered by Blogger