October 16, 2006

Camp Renovations Update
Report #2


We got underway with the excavating and foundation preparations for the boathouse/studio this weekend (Oct 14 & 15). On Saturday it was very rainy and a bit of a mud bath was created. By the end of the day on Sunday the hole was dug, gravel laid and the drain pipes in. The next steps will be to put in the slab insulation, build the forms and place the rebar prior to pouring the concrete. Once the slab is done a back wall and two ‘knee’ walls have to be added before the framing starts. The contractor hopes to have the slab poured before this coming weekend.